EMS Limited received a Letter of Acceptance from UP Jal Nigam (Urban) for a major water supply project. The order falls under the Agra Water Supply Re-Organisation Scheme (Trans Yamuna Zone-I & II – Package 1). The estimated value of the project is about 104.05 INR-Crore.
The water supply project will work to cover surveying, soil investigation, engineering, and design. The company will construct, test, and commission key facilities within the scheme, which includes an intake well cum pump house with an approach bridge. Furthermore, the works feature a raw water rising main of 1100 mm diameter. EMS will build a 55 MLD water treatment plant with advanced processes.
Also Read: NHAI Guwahati Ring Road, Assam
Additionally, it will monitor manpower, materials, and schedules throughout the 24-month timeline. This water supply project will strengthen water supply infrastructure while expanding the company’s execution portfolio.

Biltrax Construction Data is tracking 36,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. Furthermore, the image featured in this article is for representation purposes only. It does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.