Singareni to develop Telangana’s first pumped storage power project

Shravani Pawar Jun 23, 2025 0

Singareni Collieries Company Ltd (SCCL) is planning to establish the first pumped storage (hydel) power project of Telangana near the Medipally OC mine site. The decision to establish this pumped storage power project was taken under the directions given by the State Government.

The detailed project report (DPR) for this has been entrusted to the Central Government agency, WAPCOS. The DPR will consist of the preliminary study on the scope of this project, including geological, geotechnical, and hydrology studies, as well as civil, mechanical, and electrical designs, environmental aspects, and safety works.

Also read: Upcoming Luxury Residential Project – Raheja Exotica

The estimated revenue of this project is 3,000 INR-Crore, and it would have a life of 40 years. This project by Singareni in Telangana further marks a step towards the sustainable generation of energy in the state. 


Biltrax Construction Data is tracking 35,000+ projects on their technology platform for their clients.

Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.

Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.

Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. Furthermore, the image featured in this article is for representation purposes only. It does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.

0

Discover more from Biltrax Media, A Biltrax Group venture

Subscribe to get the latest posts sent to your email.

Leave a Reply

Your email address will not be published. Required fields are marked *