Dilip Buildcon Limited (DBL) has received a Letter of Award (LoA) from the Odisha Bridge & Construction Corporation (OB&CC) for an EPC road project in Odisha. The contract is valued at 160.20 INR-Crore, excluding GST. The Odisha EPC road project is located in Sundargarh district. According to the company, the project will be completed within 18 months.
The scope includes the construction of a six-lane diversion road along with service roads on the Duduka–Gopalpur–Toparia Road. The project covers the stretch from 4.700 Km to 11.500 Km. Dilip Buildcon will execute the project under the Engineering, Procurement and Construction (EPC) model. The company also stated that the contract has been awarded by a domestic entity and does not qualify as a related-party transaction.
Also Read: Integrated Residential Township – Reliance Township, Jamnagar
The Odisha EPC road project will strengthen Dilip Buildcon’s road infrastructure portfolio and execution pipeline. Additionally, the project will support ongoing investments in transport infrastructure across the state. The new corridor will enhance road connectivity in Sundargarh district upon completion.

Biltrax Construction Data is tracking 65,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. Furthermore, the image featured in this article is for representation purposes only. It does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.