Chief Minister Devendra Fadnavis has given in-principle clearance to the Twin Tunnel project, Integrated Road Tunnel System (Patal Lok). One tunnel will connect Bandra-Worli Sea Link to the Bandra-Kurla Complex (BKC). Meanwhile, the second tunnel will connect Terminal 2 of Chhatrapati Shivaji Maharaj International Airport with the Eastern Express Highway.
The Twin Tunnel project will cover nearly 31 Km, improving east-west connectivity across Mumbai. It will connect the Bandra-Worli Sea Link, the Bullet Train station at BKC, Dharavi, Mumbai Airport, the Western Express Highway, and the Eastern Express Highway through dedicated entry and exit routes.
Also Read: Upcoming Sardar Vallabhbhai Patel International Airport Terminal 3 expansion, Ahmedabad
Furthermore, along with the Twin Tunnel project, the Chief Minister has approved the revised alignment of the Bhayandar/Uttan-Virar route. It will connect Mumbai and Vadhavan. Additionally, BMC will build the Dahisar-Bhayandar stretch, and MMRDA will build the next stretch to Virar.
Moreover, the state had approved a four-plus-four lane sea link with two emergency lanes. The project was estimated to cost 58,754 INR-Crore. It was a 55.12 Km road, with a 24.35 Km main sea link and 30.77 km of connecting roads at Uttan, Vasai, and Virar. MMRDA has now planned a coastal road. It will have three-plus-three lanes and two for emergencies. Additionally, the coastal road will have five interchanges and will connect to the Delhi-Mumbai Expressway. Consequently, the project cost will be reduced to an estimated 38,000 INR-Crore.

Biltrax Construction Data is tracking 65,000+ projects on their technology platform for their clients.
Get exclusive access to upcoming projects in India with actionable insights. Furthermore, gain a competitive advantage for your products in the Indian Construction Market.
Visit www.biltrax.com or email us at contact@biltrax.com to become a subscriber and generate leads.
Disclaimer: The information herein is based upon information obtained in good faith from sources believed to be reliable. All such information and opinions can be subject to change. Furthermore, the image featured in this article is for representation purposes only. It does not in any way represent the project. If you wish to remove or edit the article, please email editor@biltrax.com.
Discover more from Biltrax Media, A Biltrax Group venture
Subscribe to get the latest posts sent to your email.